MSN #0022-1601
Expand the football practice field to the east by as much as 45 feet. Project also replaces the topsoil in the existing practice field to provide firmer footing.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total | $791,000 |
Construction | $667,000 |
Design | $65,000 |
Mgt. | – |
Contingency | $59,000 |
Equipment | – |
Other Fees | – |
Sources | |
PR Cash | $791,000 |
Timeline
A/E Selection | 11/2016 |
35% Design Report | 01/2017 – 03/2017 |
Construction Documents | 02/2017 – 04/2017 |
Bid Date | 03/2017 |
Construction | 05/2017 – 06/2017 |
Substantial Completion | 07/2017 |
Occupancy | 08/2017 |
Key Stakeholders
Occupants | UW Athletics |
User Reps | Barry Fox |
UW PM | Matt Collins |
DFD PM | N/A |
A/E | SmithGroupJJR |
Design Arch. | N/A |
Landscape Arch. | N/A |
Structural Engr. | N/A |
General Contractor | Golf Creations |
Plumbing | TBD |
Mechanical | TBD |
Fire Protection | TBD |
Electrical | TBD |