This project is a 19,710 ASF/ 27,999 GSF remodel of the 2nd and 3rd floors of Wendt Commons. The second floor will be converted to an open concept innovation and design center along with meeting spaces, offices, a conference room, and storage areas around the periphery of the floor. The design suite will be defined by a large glass wall, offering secure entrance while allowing for open observation.
The space will be furnished with state of the art equipment. The third floor offices will be demolished, and three large classrooms will be constructed. Also included is the construction of a 48-seat and small group study rooms, and an expansion/renovation of the restrooms to meet current ADA standards. New electrical power and communications outlets will be provided, audio/video infrastructure will be installed, and fire alarm and smoke detection system will be upgraded.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total | $5,697,842 |
Construction | $3,092,903 |
Design | $534,925 |
Mgt. | |
Contingency | $2,070,014 |
Equipment | – |
Other Fees | – |
Funding Sources: | |
Gifts & Grants | $5,697,842 |
Timeline
Construction Documents | 10/2016 |
MEP Bid | 11/2016 |
General Contractor Bid | 12/2016 |
Construction | 01/2017 – 08/2017 |
Substantial Completion | 09/2017 |
Occupancy | 09/2017 |
Key Stakeholders
Occupants | College of Engineering |
User Reps | Sharon Devenish |
UW PM | Stu LaRose |
A/E | Aro Eberle |
Design Arch. | Mike Eberle |
Landscape Arch. | N/A |
Structural Engr. | N/A |
Delivery Method | Design-Bid-Build Single Prime |
General Contractor | CG Schmidt |
Plumbing | Pertzborn |
Mechanical | Illingworth/ Kilgust |
Fire Protection | Pertzborn |
Electrical | Forward Electric |
Area Data
GSF | 27,999 |
ASF | 19,710 |
Efficiency | 70.40% |
Construction $/GSF | $110 |
Total Project $/GSF | $204 |