DFDM #17B1S
This pre-design study evaluated the addition of premium seating for Camp Randall’s south end zone seating section and the Field House.
Also it evaluated potential improvements to the west side bowl Press Box including interior upgrades for two of the levels and exterior window replacement and precast panel repairs.
UW Field House Historic Structure Report, January 2019
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total | $180,000 |
Future Project: | |
Total | TBD |
Construction | TBD |
Design | TBD |
Mgt. | TBD |
Contingency | TBD |
Equipment | TBD |
Other Fees | TBD |
Funding Sources: | |
Agency Funds | $180,000 |
Timeline
A/E Selection | 02/2017 |
Draft Report | 02/2017 – 08/2017 |
Final Report | 08/2017 – 11/2017 |
Key Stakeholders
Occupants | UW Athletics |
User Reps | Barry Fox |
UW PM | Matt Collins |
DFD PM | Tim Luttrell |
A/E | Berners-Schober |
Design Arch. | BSA |
Landscape Arch. | N/A |
Structural Engr. | N/A |