DFD #15B1Z
The Elm Drive Lift Station Rehabilitation will create a new pumping station adjacent to the existing pumping station at Elm Drive. The project will include a steel drywell with cathodic protection, electrical controls, dual centrifugal pumps, new suction piping, new discharge piping to the existing force main, HVAC system meeting current controls, new power supply and backup power from Dejope Hall, a new wet well manhole, excavation, sheeting, dewatering, backfill, restoration, and landscaping. The construction of a new station allows the existing pumping station to stay online until the new station is tested; therefore, avoiding bypass pumping.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total Soft Costs | $139,200.00 |
Total Construction Costs | $883,300.00 |
Total Project Costs | $1,022,500.00 |
Funding Sources: | |
GFSB | $1,022,500 |
Timeline
A/E Selection | 04/2015 |
Design Report | 10/2016 |
Bid Date | 10/2017 |
Construction | 11/2017 |
Substantial Completion | 11/2018 |
Key Stakeholders
Occupants | Bldgs in Elm Drive Area |
User Reps | Marcella Otter |
UW PM | Brandon Braithwaite |
DFDM PM | Sally Shumaker |
A/E | Strand Associates |
Design Arch. | Strand Associates |
Landscape Arch. | N/A |
Structural Engr. | Strand Associates |
General Contractor | Speedway S&G |
Plumbing | TBD |
Mechanical | TBD |
Fire Protection | TBD |
Electrical | Pieper Electric Inc. |
Area Data
GSF | N/A |
ASF | N/A |
Efficiency | N/A |
Construction $/GSF | N/A |
Total Project $/GSF | N/A |