MSN# 0481-1809
This project seeks to renovate space within the Engineering Centers Building. Within ECB, laboratory space is greatly needed to support growth within the undergraduate majors. By creating a new Design Laboratory for Biological, Chemical Studies, and Biomedical Engineering, College of Engineering faculty will be able to increase their ability to enhance the learning experience for staff and students. Since all interior elements within the existing space have been removed, the new Design Laboratory will require infrastructure for sinks, fume hoods, biosafety cabinets, compressed air and nitrogen, and snorkel vents.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total Soft Costs | $246,000 |
Total Construction Costs | $1,754,000 |
Total Project Costs | $2,000,000 |
Funding Sources: | |
Gifts & Grants | $2,000,000 |
Timeline
A/E Selection | 12/2018 |
Design Report | 04/2019 |
Bid Date | 08/2019 |
Start Construction | 09/2019 |
Substantial Completion | 04/2020 |
Key Stakeholders
Occupants | College of Engineering |
User Reps | Peter Nemmetz |
UW PM | Dennis Rodenberg |
DFDM PM | TBD |
A/E | Continuum |
Structural Engr. | TBD |
General Contractor | TBD |
Plumbing | TBD |
Mechanical | TBD |
Fire Protection | TBD |
Electrical | TBD |
Area Data
GSF | 3,916 |
ASF | TBD |
Efficiency | TBD |
Construction $/GSF | $400 |
Total Project $/GSF | TBD |