DFD# 18E1C
The scope of work involves the removal and replacement of the retaining wall at the southeast corner of the Field House. The current wall requires repairs and will be rebuilt to have better drainage behind the wall, be more structurally sound and upgrade the aesthetics of the area. Paving to the east, south and at the southwest corner of the Field House, out to the back of curb along Monroe Street, Little Street and Regent Street will be removed and replaced. The entire area to the south of the Field House will be removed, including the stairs, and reconfigured to create a more functional space and upgrade the look and feel of the area to better celebrate the approach to the historic Field House.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total Soft Costs | TBD |
Total Construction Costs | TBD |
Total Project Costs | $1,826,000 |
Funding Sources: | |
AGFO | $188,000 |
Timeline
A/E Selection | 06/2018 |
Design Report | TBD |
Bid Date | 11/2019 |
Start Construction | 02/2020 |
Substantial Completion | 08/2020 |
Key Stakeholders
Occupants | Barry Fox |
User Reps | TBD |
UW PM | Brandon Braithwaite |
DFDM PM | Tim Luttrell |
A/E | BSA |
Structural Engr. | TBD |
General Contractor | TBD |
Plumbing | TBD |
Mechanical | TBD |
Fire Protection | TBD |
Electrical | TBD |
Area Data
GSF | TBD |
ASF | TBD |
Efficiency | TBD |
Construction $/GSF | TBD |
Total Project $/GSF | TBD |