This project, located on the south shore of Lake Mendota immediately west of the Memorial Terrace, includes replacement of all components of the boat docks and storage decks including ramps, gangways, and anchoring systems, as well as shoreline restoration and other site amenities for the UW Hoofers Sailing Club.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
Total Soft Costs | $414,147 |
Total Construction Costs | $4,485,853 |
Total Project Costs | $4,900,000 |
Funding Sources: | |
Gift/Grant | $4,900,000 |
Timeline
A/E Selection | 04/2017 |
Design Report | 02/2018 |
Bid Date | 08/2018 |
Start Construction | 10/2018 |
Substantial Completion | 07/2019 |
Key Stakeholders
Occupants | Memorial Union |
User Reps | Joel Gerrits |
UW PM | Bo Muwahid |
A/E | SmithGroupJJR |
Design Arch. | N/A |
Landscape Arch. | SmithGroupJJR |
Structural Engr. | SmithGroupJJR |
General Contractor | Michels |
Plumbing | TBD |
Mechanical | TBD |
Fire Protection | TBD |
Electrical | Universal Power System |
Area Data
GSF | N/A |
ASF | N/A |
Efficiency | N/A |
Construction $/GSF | N/A |
Total Project $/GSF | N/A |