DFD #16B1C
This project will replace the existing sanitary sewer lift station in the lower level of the Limnology Building and replace the associated four-inch force main and the adjacent four-inch domestic water service to the building and the adjacent Water Science and Engineering Laboratory.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
| Total Soft Costs | $115,000 |
| Total Construction Costs | $733,000 |
| Total Project Costs | $848,000 |
| Funding Sources: | |
| GFSB | $584,400 |
| Agency Cash | $262,600 |
Timeline
| A/E Selection | 03/2016 |
| Design Report | 12/2017 |
| Bid Date | 04/2019 |
| Start Construction | 06/2019 |
| Project Close-Out | 12/2019 |
Key Stakeholders
| Occupants | UW Plumbing |
| User Reps | Marcella Otter |
| UW PM | Brandon Braithwaite |
| DFDM PM | Kris Anderson |
| A/E | Ayres Associates |
| Design Arch. | N/A |
| Landscape Arch. | N/A |
| Structural Engr. | N/A |
| General Contractor | Terra Engineering |
| Plumbing | TBD |
| Mechanical | Hooper Corporation |
| Fire Protection | TBD |
| Electrical | TBD |
Area Data
| GSF | N/A |
| ASF | N/A |
| Efficiency | N/A |
| Construction $/GSF | N/A |
| Total Project $/GSF | N/A |