MSN #0040-1601
To resurface the McClimon 400M outdoor track and adjacent field event areas; and surface the practice throw area and javelin runway.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
| Total | $834,300 |
| Construction | $726,700 |
| Design | $37,400 |
| Mgt. | $25,200 |
| Contingency | $45,000 |
| Equipment | – |
| Other Fees | – |
| Funding Sources: | |
| Gift | $834,300 |
Timeline
| A/E Selection | 08/2016 – 12/2016 |
| 35% Design Report | 01/2017 – 02/2017 |
| Construction Documents | 02/2017 – 04/2017 |
| Bid Date | 04/2017 |
| Rebid Date | 06/2017 |
| Construction | 06/2018 – 07/2018 |
| Substantial Completion | 07/2018 |
| Occupancy | 07/2018 |
Key Stakeholders
| Occupants | Wisconsin Athletics |
| User Reps | Barry Fox |
| UW PM | Matt Collins |
| DFD PM | N/A |
| A/E | Rettler Associates |
| Design Arch. | TBD |
| Landscape Arch. | TBD |
| Structural Engr. | TBD |
| General Contractor | Beynon Sports |
| Plumbing | TBD |
| Mechanical | TBD |
| Fire Protection | TBD |
| Electrical | TBD |