This replacement project demolishes the 125,118 ASF / 191,254 GSF Southeast Recreation Facility (SERF) and constructs a 181,830 ASF / 250,800 GSF facility which is a 31% expansion. It will include all the required utility improvements and house expanded spaces such as functional fitness areas, a nine-basketball court gymnasium, an indoor walking and jogging track, and several multi-purpose rooms. A 50-meter competition pool and separate diving well will be shared between Recreational Sports and the Division of Intercollegiate Athletics.
This is an accordion element with a series of buttons that open and close related content panels.
BUDGET
Total Soft Costs | $23,631,000 |
Total Construction Costs | $72,910,000 |
Total Project Costs | $96,541,000 |
Funding Sources: | |
PRSB | $53,872,600 |
Gift/Grant | $42,080,000 |
Cash | $588,400 |
TIMELINE
A/E Selection | 09/2015 |
Design Report | 02/2017 |
Bid Date | 08/2008 |
Start Construction | 10/2017 |
Substantial Completion | 01/2020 |
KEY STAKEHOLDERS
Occupants | Rec Sports |
User Reps | John Horn |
UW PM | Ann Hayes |
DFDM PM | Wendy von Below |
A/E | Workshop Architects, Inc. |
Design Arch. | HOK |
Landscape Arch. | Ken Saiki Design |
Structural Engr. | GRAEF-USA Inc. |
General Contractor | Miron Construction |
Plumbing | Hooper Corp. |
Mechanical | NAMI |
Fire Protection | JF Ahern |
Electrical | Staff Electric |
AREA DATA
GSF | 248,300 |
ASF | 170,800 |
Efficiency | 68.79% |
Construction $/GSF | $294 |
Total Project $/GSF | $361 |