DFD #14I1O
This project reconfigures two gravel parking lots into a single lot, provides various site improvements for storm water drainage and operating efficiencies, and provides a new 40’x80′ pre-engineered wood framed with metal siding equipment shed. Electrical power and lighting will be supplied and served from an adjacent campus building.
This is an accordion element with a series of buttons that open and close related content panels.
Budget
| Total | $450,300 |
| Construction | $258,200 |
| Design | $34,600 |
| Mgt. | $15,800 |
| Contingency | $35,800 |
| Equipment | – |
| Other Fees | $5,900 |
| Funding Sources | |
| PR Funds | $450,300 |
Timeline
| A/E Selection | 12/2014 |
| 35% Design Report | 05/2015 – 11/2015 |
| Construction Documents | 12/2015 – 02/2016 |
| Bid Date | 04/2016 |
| Rebid Date | 12/2016 |
| Construction | 04/2017 – 07/2017 |
| Substantial Completion | 07/2017 |
| Occupancy | 09/2017 |
Key Stakeholders
| Occupants | UW Housing |
| User Reps | Evan Quilling |
| UW PM | Bo Muwahid |
| DFD PM | Jake Ehmke |
| A/E | Kontext Architects |
| Design Arch. | Kontext Architects |
| Civil Engr. | Edge Consulting |
| Structural Engr. | N/A |
| General Contractor | N/A |
| Plumbing | N/A |
| Mechanical | N/A |
| Fire Protection | N/A |
| Electrical | N/A |
Area Data
| GSF | 3,200 |
| ASF | 3,120 |
| Efficiency | 98.00%% |
| Construction $/GSF | $80 |
| Total Project $/GSF | $140 |